Malta Gaming Authority’s participation at the ICE Gaming show London, Excel 2015

What was the challenge?

The major challenge on this project was the fact that there was only three days build-up and two days breakdown available at London Excel. This meant stringent logistical co-ordination using our Malta and Czech Republic set-ups to co-ordinate the event. The design of the stand provided by the Authority was not such that it could be erected and dismantled within the time available. We therefore had to ensure that our method statement for the construction process, along with a risk assessment and health & safety declarations are in place to ensure that inspite of the pressure being imposed on us, we would not infringe any of the rigorous regulations imposed on us by the organisers.

The contract was executed to the total satisfaction of the client.

Description of project

The Authority issued a public tender for works on a turn-key bases. The project included the production, build-up and breakdown of the stand in London promoting the Authority as the Operator for this fast growing sector in Malta

List of services

Design and build of Custom produced stand